New Delta Flume
Visit to the new Deltares Delta Flume (Advanced Wave Test Facility) in Delft – This 9.5m deep by 5m wide facility will generate wave heights of 2.2m for testing materials and structural responses to large wave actions. (left to right) John Lonnquest (Chief, USACE O/History), Will Logan (Deputy Director, ICIWaRM), Deltares Official, LTC Antoinette Gant (OASA-CW), Project Engineer (Deltares), Mark Sudol (Director, USACE Navigation and Civil Works Decision Support Ctr), James Dalton (Chief, USACE Engineering and Construction), Mary Fencl (Deltares), Ms Jo-Ellen Darcy (ASA-CW), Bob Pietrowsky (Director, IWR).

Download Image: Full Size (1.82 MB)
Tags:
Photo by: N/A |  VIRIN: 141112-A-EX065-001.JPG