Corps removes Green River Dam No. 6
The excavators break up Dam No. 6 while building a work pad from which to remove material during the demolition, which was completed in April.

Download Image: Full Size (1.19 MB)
Tags:
Photo by: USACE |  VIRIN: 170428-A-CE999-044.JPG