LIST OF PRESENTATIONS AT BOARD MEETING #53
Mississippi River Valley Division Prioritized Backlog Maintenance by Steve Jones and Leon Mucha, PE
Upper Mississippi River System: Navigation and Ecosystem Sustainability Program
Lockport Pool: Chicago Sanitary &Ship Canal Illinois Waterway by Gary Loss, PE
Ohio River Mainstem Systems Study (ORMSS): Draft System Investment Plan (SIP) by Veronica Rife
John Day Lock and Dam by Sheryl A. Carrubba, PE
McAlpine Locks Replacement Project by George Flickner, PE
Chickamauga Lock by Wayne Huddleston